69 results, showing 61 to 69
On 23 June 2006, the ACCC issued its final decision to reject Hutchison's undertakings.
In December 2004 Telstra lodged unconditioned local loop service (ULLS) and line sharing service (LSS) undertakings. The undertakings set out how Telstra proposes to meet its standard access obligations to supply these services. The ACCC released its final decision on Telstra's LSS connection and disconnection charge undertaking in April 2006.
The ACCC released a Final decision on the Vodafone MTAS undertaking on the 31 March 2006.
On 23 December 2004 Optus lodged an ordinary access undertaking with the ACCC about the mobile terminating access service (MTAS).
In September 2003 Telstra lodged an access undertaking with the ACCC specifying the terms and conditions upon which it undertakes to meet its standard access obligations to supply the line sharing service (LSS).
In December 2004 the ACCC released a final decision reiterating its draft views on LCS and PSTN.
ARTC applied for a slight variation to the Interstate Rail access undertaking 2002 on 4 March 2003
Following consultation and analysis the undertaking was rejected and a final report outlining the decision was issued in July 2000.
In November 1997 Telstra lodged three undertakings with the ACCC specifying the terms and conditions upon which Telstra proposed to meet its standard access obligations to supply PSTN, GSM (digital mobile) and AMPS (analogue mobile) origination and termination services.