93 results, showing 81 to 90
In December 2005 Telstra submitted two unconditioned local loop service (ULLS) undertakings.
The ACCC released its final indicative prices in November 2006.
On 23 June 2006, the ACCC issued its final decision to reject Hutchison's undertakings.
In December 2004 Telstra lodged unconditioned local loop service (ULLS) and line sharing service (LSS) undertakings. The undertakings set out how Telstra proposes to meet its standard access obligations to supply these services. The ACCC released its final decision on Telstra's LSS connection and disconnection charge undertaking in April 2006.
The ACCC released a Final decision on the Vodafone MTAS undertaking on the 31 March 2006.
On 23 December 2004 Optus lodged an ordinary access undertaking with the ACCC about the mobile terminating access service (MTAS).
In September 2003 Telstra lodged an access undertaking with the ACCC specifying the terms and conditions upon which it undertakes to meet its standard access obligations to supply the line sharing service (LSS).
Following a public inquiry in 2003-04, a new declaration for the domestic transmission capacity service started on 1 April 2004 and expired on 31 March 2009.
In December 2004 the ACCC released a final decision reiterating its draft views on LCS and PSTN.
ARTC applied for a slight variation to the Interstate Rail access undertaking 2002 on 4 March 2003