83 results, showing 71 to 80
On 23 June 2006, the ACCC issued its final decision to reject Hutchison's undertakings.
In December 2004 Telstra lodged unconditioned local loop service (ULLS) and line sharing service (LSS) undertakings. The undertakings set out how Telstra proposes to meet its standard access obligations to supply these services. The ACCC released its final decision on Telstra's LSS connection and disconnection charge undertaking in April 2006.
The ACCC released a Final decision on the Vodafone MTAS undertaking on the 31 March 2006.
On 23 December 2004 Optus lodged an ordinary access undertaking with the ACCC about the mobile terminating access service (MTAS).
During 2003-04, the ACCC conducted a public consultation on pricing principles for the domestic transmission capacity service (DTCS), releasing its final report in September 2004.
In September 2003 Telstra lodged an access undertaking with the ACCC specifying the terms and conditions upon which it undertakes to meet its standard access obligations to supply the line sharing service (LSS).
In December 2004 the ACCC released a final decision reiterating its draft views on LCS and PSTN.
The ACCC held a consultation process about model price terms and conditions for the public switched telephone network (PSTN), unconditioned local loop service (ULLS) and local carriage service (LCS).
In March 2002 the ACCC varied the GSM termination services declaration to make it technology neutral.
The revised final report issued in April 2002 confirms the approach and includes indicative prices.