39 results, showing 11 to 20
The 2011 Hunter Valley Access Undertaking requires Australian Rail Track Corporation to submit documentation to the ACCC for the purposes of an annual compliance assessment.
The 2011 Hunter Valley Access Undertaking (2011 HVAU) requires ARTC to submit documentation to the ACCC for the purposes of an annual compliance assessment.
The accepted Hunter Valley Access Undertaking requires ARTC to submit documentation to the ACCC for the purposes of an annual compliance assessment.
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
The accepted Hunter Valley Access Undertaking requires ARTC to submit documentation to the ACCC for the purposes of an annual compliance assessment. Section 4.10 and Schedule G of the undertaking requires the ACCC to determine whether ARTC has complied with the financial model and pricing principles specified in the undertaking and whether there has been any under or over recovery of revenue from users that needs to be reconciled.
On 25 June 2015, the Independent Pricing and Regulatory Tribunal of NSW (IPART) submitted an application for accreditation to the ACCC .
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
Telstra’s migration plan requires it to develop six 'required measures' that relate to the operating processes Telstra will follow when disconnecting customers from its copper and HFC networks.
This project page contains information and correspondence about Telstra’s Roadmap and Work Plan for the development of the required measures.
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.