186 results, showing 11 to 20
The Measuring Broadband Australia program provides Australian consumers with accurate and independent information about broadband performance to assist their purchasing decisions.
The Mobile Infrastructure Report provides analysis on the change in mobile network operators' (MNOs) mobile infrastructure and coverage.
On 29 November 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC.
On 13 December 2013 the ACCC accepted NBN Co's Special Access Undertaking (SAU). The SAU commenced on 13 December 2013 and will expire in 2040.
When the ACMA is allocating spectrum licences, it may impose limits (competition limits) on the amount of spectrum that a person can acquire under the allocated licences. In determining allocation limits, the ACMA is required to consult with the ACCC on the competition limits that may be appropriate.
On 4 November 2022, T-Ports Pty Ltd applied to the ACCC seeking to be determined an exempt service provider of port terminal services at its port terminal facility currently under construction at Wallaroo.
On 12 December 2018, the ACCC commenced a combined public inquiry into making final access determinations for the 6 fixed line telecommunications services and the wholesale ADSL service.
On 31 May 2023 the ACCC released a final determination document confirming that it has determined Commodity Ag to be exempt service provider of port terminal services in relation to its port terminal facility at Albany. The exemption was made by notifiable instrument.
On 26 August 2022 Bulk Cargo Services Pty Ltd applied to the ACCC seeking to be determined an exempt service provider of port terminal services at its port terminal facility at Pinkenba, Queensland.
On 29 March 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC. NBN Co's proposed SAU variation followed an extensive industry consultation process hosted by the ACCC during the second half of 2021 to consider the future regulatory framework for the NBN.