17 results, showing 1 to 10
On 29 November 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC.
On 29 March 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC. NBN Co's proposed SAU variation followed an extensive industry consultation process hosted by the ACCC during the second half of 2021 to consider the future regulatory framework for the NBN.
On 18 June 2021, the ACCC hosted an industry roundtable to commence a process to consider the regulatory framework for the NBN.
On 3 March 2020, the Murray-Darling Basin Authority (MDBA) requested the ACCC provide its advice on the operation of sub-sections 12.02(2) to (4) of the Basin Plan water trading rules (the 12.02 provisions), to inform its review of these provisions as required under the Basin Plan 2012 (Cth). The ACCC provided this advice to the MDBA on 1 June 2020.
In response to a recommendation from the Independent Review of the Water Act 2007 in 2014, the Parliamentary Secretary to the Minister for the Environment wrote to the ACCC requesting advice on possible amendments to the Water Charge (Infrastructure) Rules 2010, Water Charge (Planning and Management Information) Rules 2010, and Water Charge (Termination Fees) Rules 2009.
On 27 May 2016, NBN Co lodged a proposed variation to its Special Access Undertaking (SAU) with the ACCC. The Competition and Consumer Act 2010 (CCA) allows NBN Co to give the ACCC a variation to an SAU already in operation. The ACCC accepted NBN Co’s current SAU on 13 December 2013, following an extensive consultation process.
On 18 August 2016 the Murray-Darling Basin Authority (MDBA) requested the ACCC’s advice on possible amendments to the Basin Plan water trading rules, which form Chapter 12 of the Basin Plan 2012 (Cth).
The ACCC provided its final advice on the water infrastructure charge rules on 26 June 2009.
ACCC reports to the next generation networks discussions.
ARTC is required to review the accepted access undertaking five years after the commencement date to determine whether any amendments to the undertaking are required as a result of changes to industry circumstances or Government legislation, rules, or regulations.