27 results, showing 1 to 10
On 23 April 2021, ARTC submitted an application to extend the term of its 2008 Interstate Access Undertaking to 30 June 2023.
On 30 March 2021, the Australian Rail Track Corporation (ARTC) submitted a new variation application for the current Hunter Valley Coal Network Access Undertaking. The ACCC published its Final Decision to consent to ARTC's 30 March variation application on 2 June 2021.
On 5 May 2020, ARTC submitted an application to vary its 2008 Interstate Access Undertaking. The variation sought to extend the term of the undertaking to 30 June 2021.
On 28 September 2018, ARTC applied to the ACCC to vary its 2011 Hunter Valley Access Undertaking.
On 21 December 2017, ARTC applied to the ACCC to vary its 2011 Hunter Valley Access Undertaking.
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
On 7 November 2014, the ACCC commenced a public inquiry into varying the 2012 domestic transmission capacity service (DTCS) final access determination.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
On 17 April 2014, the ACCC commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.