47 results, showing 1 to 10
On 23 August 2023, Australia Post provided the ACCC with a draft price notification. The notification proposes to increase the price of reserved ordinary letters delivered at the regular timetable by 25%.
On 27 September 2023, Airservices Australia submitted a draft price notification to the ACCC proposing increases to its charges for enroute navigation, terminal navigation, and aviation rescue and fire-fighting services, effective from April 2024.
On 11 August 2022, Australia Post provided the ACCC with a draft price notification proposing to increase the price to deliver reserved ordinary letters delivered at the regular timetable.
On 1 August 2019, Australia Post provided the ACCC with a draft price notification proposing to increase prices of ordinary letters delivered at the regular timetable by 10%.
The Essential Services Commission (Victoria) (ESCV) has applied to become the accredited regulator for the period 17 February 2022 to 16 February 2032.
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
On 23 September 2015, the ACCC made a Final Decision to accredit IPART under Part 9 of the Water Charge (Infrastructure) Rules 2010 (WCIR).
Australia Post has provided the ACCC with a draft price notification regarding proposed price increases for letter services. Australia Post is proposing to introduce a basic postage rate of $1 for letters delivered at a new slower timetable, which allows up to an extra three business days for delivery to occur. Postage stamps for letters delivered at the current timetable cost 70 cents. Australia Post’s proposal also includes price increases for the delivery of large letters.
Airservices Australia (Airservices) has submitted a draft price notification to the ACCC proposing increases to its charges for terminal navigation (TN) and aviation rescue and fire-fighting (ARFF) services, effective from 1 July 2015.
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.