13 results, showing 1 to 10
On 6 May 2024 ARTC submitted an application to extend the term of its 2008 Interstate Access Undertaking to 31 December 2024. This is a 6-month extension from the existing expiration date of 30 June 2024.
On 26 February 2024 the ACCC sent a request to ARTC to provide further information to support the assessment of the Proposed Undertaking. The ACCC published public submissions in response to a consultation paper on ARTC's Interstate Rail Network Access Undertaking application.
The 2011 Hunter Valley Coal Network Access Undertaking (HVAU) requires the Australian Rail Track Corporation (ARTC) to send documents to the ACCC for an annual compliance assessment. As part of this assessment, we examine ARTC's operating costs, including overheads.
The NBN Services in Operation record keeping rules require NBN Co to provide information on the number of Access Virtual Circuit (AVC) services in operation, the amount of Connectivity Virtual Circuit (CVC) capacity being acquired and average CVC utilisation over the NBN.
On 28 September 2011 the ACCC accepted the 2011 Undertaking provided to the ACCC by CBH on 20 September 2011.
GrainCorp provided the ACCC with a revised Proposed 2011 Undertaking on 31 January 2011 which contains technical amendments to the Undertaking lodged on 22 September 2010.
Information about the Access undertaking for Emerald Logistics Services Pty Ltd (Emerald).
On 28 September 2011 the ACCC accepted, under Division 6 of Part IIIA of the Competition and Consumer Act 2010 (CCA), the 2011 Undertaking provided to the ACCC by Viterra on 22 September 2011.
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
On 15 April 2009, GrainCorp lodged an Undertaking for assessment.