43 results, showing 1 to 10
On 2 September 2020, Uniti Group Limited (Uniti) submitted a joint functional separation undertaking and a supporting submission in accordance with section 151C of the Telecommunications Act. The ACCC accepted the undertaking on 21 October 2020.
On 8 November 2021, TPG submitted a joint functional separation undertaking to the ACCC on behalf of itself and various subsidiaries in accordance with section 151C of the Telecommunications Act 1997.
Under section 2.2(b) of the 2008 Interstate Access Undertaking (IAU), ARTC must submit to the ACCC a written statement outlining whether or not it intends to submit a new undertaking to the ACCC for its consideration, no later than six months prior to the expiry of the 2008 IAU.
On 8 May 2019, NBN Co lodged a proposed variation to its Special Access Undertaking (SAU) with the ACCC. The Competition and Consumer Act 2010 (CCA) allows NBN Co to give the ACCC a variation to an SAU already in operation. The ACCC accepted NBN Co’s current SAU on 13 December 2013, following an extensive consultation process.
On 22 June 2017, NBN Co formally withdrew its original SAU variation lodged with the ACCC on 27 May 2016. NBN Co simultaneously lodged a new proposed variation to its SAU (revised SAU variation).
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
These letters from the ARTC document the progress of various reviews related to the 2011 Hunter Valley undertaking.
The ACCC is consulting on what information NBN Co should disclose about the rollout of its network.
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).