125 results, showing 51 to 60
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.
On 11 July 2013, the Australian Competition and Consumer Commission (ACCC) commenced a combined public inquiry into the declaration of the fixed line services.
On 11 July 2013 the ACCC commenced an inquiry into the Domestic Transmission Capacity Service
On 19 November 2013, NBN Co Ltd lodged a varied special access undertaking (SAU) with the ACCC.
The ACCC is now considering the SAU under the criteria set out in section 152CBD of the Competition and Consumer Act 2010 (CCA).
On 18 September 2013 the ACCC decided to vary the Facilities Access Code.
On 29 May 2013, the ACCC made a final access determination for the declared Wholesale ADSL Service.
On 22 February 2012, the ACCC made a decision to declare a layer 2 bitstream service, to be called the local bitstream access service (LBAS).
On 3 October 2012, the ACCC made a final access determination for the Local Bitstream Access Service (LBAS). A copy of the LBAS final access determination is available on the public register of access determinations.
On Friday 7 September 2012, NBN Co withdrew the Special Access Undertaking (SAU) that it lodged with the ACCC late last year (original SAU).