3 results, showing 1 to 3
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).