5 results, showing 1 to 5
The Essential Services Commission (Victoria) (ESCV) has applied to become the accredited regulator for the period 17 February 2022 to 16 February 2032.
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
On 23 September 2015, the ACCC made a Final Decision to accredit IPART under Part 9 of the Water Charge (Infrastructure) Rules 2010 (WCIR).
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).