48 results, showing 21 to 30
On 19 November 2013, NBN Co Ltd lodged a varied special access undertaking (SAU) with the ACCC.
The ACCC is now considering the SAU under the criteria set out in section 152CBD of the Competition and Consumer Act 2010 (CCA).
On Friday 7 September 2012, NBN Co withdrew the Special Access Undertaking (SAU) that it lodged with the ACCC late last year (original SAU).
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC.
In September 2010, ARTC submitted a proposed access undertaking to the ACCC for assessment.
On 23 April 2009, ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC for assessment.
On 15 April 2009, GrainCorp lodged an Undertaking for assessment.
Viterra Operations Limited (Viterra) operates bulk wheat port terminals at Port Adelaide (Inner Harbour and Outer Harbour), Thevenard, Port Lincoln, Wallaroo and Port Giles and is a subsidiary of Glencore International Plc.
On 22 April 2009 the ACCC decided to reject the Undertaking. The ACCC released a final decision to reject this Telstra and ULLS Undertaking on 28 April 2009.