86 results, showing 71 to 80
On 24 December 2012, ARTC withdrew its proposed non-TUT related performance incentives variation.
ARTC lodged a variation request on 7 September 2012 which the ACCC consented to on 12 October 2012.
ARTC lodged a variation request on 2 December 2011 which was then withdrawn on 15 August 2012.
On 18 April 2012, the ACCC decided to consent to ARTC’s application to vary its undertaking.
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC.
In September 2010, ARTC submitted a proposed access undertaking to the ACCC for assessment.
On 23 April 2009, ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC for assessment.
On 15 April 2009, GrainCorp lodged an Undertaking for assessment.
Viterra Operations Limited (Viterra) operates bulk wheat port terminals at Port Adelaide (Inner Harbour and Outer Harbour), Thevenard, Port Lincoln, Wallaroo and Port Giles and is a subsidiary of Glencore International Plc.