46 results, showing 31 to 40
This project page contains Telstra’s submission of required measures 2, 3, 4 and 6.
On 18 September 2013 the ACCC decided to vary the Facilities Access Code.
The ACCC carried out a compliance assessment and determined that ARTC has complied with pricing principles specified in clause 4.10 of the undertaking for the period 1 July 2011 to 31 December 2011.
On 22 February 2012, the ACCC made a decision to declare a layer 2 bitstream service, to be called the local bitstream access service (LBAS).
On 6 March 2012, Telstra's Structural Separation Undertaking and Migration Plan came into force.
On 16 December 2011 the ACCC commenced an inquiry into declaration of wholesale ADSL services under section 152AL of the Competition and Consumer Act 2010 (the Act).
In July 2010, Telstra announced that it would be upgrading its existing copper network in South Brisbane to a fibre-to-the-premises network.
In April 2011, following further consultation with industry participants, the ACCC decided not to commence a declaration inquiry.
On 30 September 2010 the ACCC issued a final report varying the domestic transmission capacity service (DTCS) declaration. In the final report the ACCC decided to vary the DTCS service description to include Ethernet network interfaces.
The ACCC's final view is that it is not satisfied that varying the ULLS service description at this time would promote the long-term interests of end users.