75 results, showing 71 to 75
In September 2003 Telstra lodged an access undertaking with the ACCC specifying the terms and conditions upon which it undertakes to meet its standard access obligations to supply the line sharing service (LSS).
In December 2004 the ACCC released a final decision reiterating its draft views on LCS and PSTN.
ARTC applied for a slight variation to the Interstate Rail access undertaking 2002 on 4 March 2003
Following consultation and analysis the undertaking was rejected and a final report outlining the decision was issued in July 2000.
In November 1997 Telstra lodged three undertakings with the ACCC specifying the terms and conditions upon which Telstra proposed to meet its standard access obligations to supply PSTN, GSM (digital mobile) and AMPS (analogue mobile) origination and termination services.