92 results, showing 51 to 60
This project page contains Telstra’s submission of required measures 2, 3, 4 and 6.
On 18 September 2013 the ACCC decided to vary the Facilities Access Code.
The ACCC carried out a compliance assessment and determined that ARTC has complied with pricing principles specified in clause 4.10 of the undertaking for the period 1 July 2011 to 31 December 2011.
On 22 February 2012, the ACCC made a decision to declare a layer 2 bitstream service, to be called the local bitstream access service (LBAS).
On Friday 7 September 2012, NBN Co withdrew the Special Access Undertaking (SAU) that it lodged with the ACCC late last year (original SAU).
On 6 March 2012, Telstra's Structural Separation Undertaking and Migration Plan came into force.
On 16 December 2011 the ACCC commenced an inquiry into declaration of wholesale ADSL services under section 152AL of the Competition and Consumer Act 2010 (the Act).
In July 2010, Telstra announced that it would be upgrading its existing copper network in South Brisbane to a fibre-to-the-premises network.
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC.