21 results, showing 11 to 20
The accepted Hunter Valley Access Undertaking requires ARTC to submit documentation to the ACCC for the purposes of an annual compliance assessment. Section 4.10 and Schedule G of the undertaking requires the ACCC to determine whether ARTC has complied with the financial model and pricing principles specified in the undertaking and whether there has been any under or over recovery of revenue from users that needs to be reconciled.
The ACCC is consulting on what information NBN Co should disclose about the rollout of its network.
On 7 November 2014, the ACCC commenced a public inquiry into varying the 2012 domestic transmission capacity service (DTCS) final access determination.
On 17 April 2014, the ACCC commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.
The Hunter Valley Access Undertaking (HVAU) accepted by the ACCC on 29 June 2011 requires ARTC to submit documentation for the purposes of an annual compliance assessment conducted by the ACCC.
The ACCC carried out a compliance assessment and determined that ARTC has complied with pricing principles specified in clause 4.10 of the undertaking for the period 1 July 2011 to 31 December 2011.
In accordance with clause 4.1B of the final access determinations, clause 4.1A of the final access determinations expired on 7 December 2012.
On 6 March 2012, Telstra's Structural Separation Undertaking and Migration Plan came into force.
On 16 December 2011 the ACCC released a final decision to vary the final access determinations to remove the exemption provisions for the WLR, LCS and PSTN OA declared fixed line services.