35 results, showing 1 to 10
On 8 November 2021, TPG submitted a joint functional separation undertaking to the ACCC on behalf of itself and various subsidiaries in accordance with section 151C of the Telecommunications Act 1997.
Under section 2.2(b) of the 2008 Interstate Access Undertaking (IAU), ARTC must submit to the ACCC a written statement outlining whether or not it intends to submit a new undertaking to the ACCC for its consideration, no later than six months prior to the expiry of the 2008 IAU.
On 8 May 2019, NBN Co lodged a proposed variation to its Special Access Undertaking (SAU) with the ACCC. The Competition and Consumer Act 2010 (CCA) allows NBN Co to give the ACCC a variation to an SAU already in operation. The ACCC accepted NBN Co’s current SAU on 13 December 2013, following an extensive consultation process.
On 3 March 2020, the Murray-Darling Basin Authority (MDBA) requested the ACCC provide its advice on the operation of sub-sections 12.02(2) to (4) of the Basin Plan water trading rules (the 12.02 provisions), to inform its review of these provisions as required under the Basin Plan 2012 (Cth). The ACCC provided this advice to the MDBA on 1 June 2020.
In response to a recommendation from the Independent Review of the Water Act 2007 in 2014, the Parliamentary Secretary to the Minister for the Environment wrote to the ACCC requesting advice on possible amendments to the Water Charge (Infrastructure) Rules 2010, Water Charge (Planning and Management Information) Rules 2010, and Water Charge (Termination Fees) Rules 2009.
On 22 June 2017, NBN Co formally withdrew its original SAU variation lodged with the ACCC on 27 May 2016. NBN Co simultaneously lodged a new proposed variation to its SAU (revised SAU variation).
On 18 August 2016 the Murray-Darling Basin Authority (MDBA) requested the ACCC’s advice on possible amendments to the Basin Plan water trading rules, which form Chapter 12 of the Basin Plan 2012 (Cth).
The ACCC provided its final advice on the water infrastructure charge rules on 26 June 2009.
These letters from the ARTC document the progress of various reviews related to the 2011 Hunter Valley undertaking.
The ACCC is consulting on what information NBN Co should disclose about the rollout of its network.