37 results, showing 1 to 10
On 23 August 2023, Australia Post provided the ACCC with a draft price notification. The notification proposes to increase the price of reserved ordinary letters delivered at the regular timetable by 25%.
On 11 August 2022, Australia Post provided the ACCC with a draft price notification proposing to increase the price to deliver reserved ordinary letters delivered at the regular timetable.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the water charge rules.
On 3 March 2020, the Murray-Darling Basin Authority (MDBA) requested the ACCC provide its advice on the operation of sub-sections 12.02(2) to (4) of the Basin Plan water trading rules (the 12.02 provisions), to inform its review of these provisions as required under the Basin Plan 2012 (Cth). The ACCC provided this advice to the MDBA on 1 June 2020.
In response to a recommendation from the Independent Review of the Water Act 2007 in 2014, the Parliamentary Secretary to the Minister for the Environment wrote to the ACCC requesting advice on possible amendments to the Water Charge (Infrastructure) Rules 2010, Water Charge (Planning and Management Information) Rules 2010, and Water Charge (Termination Fees) Rules 2009.
On 1 August 2019, Australia Post provided the ACCC with a draft price notification proposing to increase prices of ordinary letters delivered at the regular timetable by 10%.