14 results, showing 1 to 10
On 25 June 2015, the Independent Pricing and Regulatory Tribunal of NSW (IPART) submitted an application for accreditation to the ACCC .
On 28 September 2011 the ACCC accepted the 2011 Undertaking provided to the ACCC by CBH on 20 September 2011.
GrainCorp provided the ACCC with a revised Proposed 2011 Undertaking on 31 January 2011 which contains technical amendments to the Undertaking lodged on 22 September 2010.
Information about the Access undertaking for Emerald Logistics Services Pty Ltd (Emerald).
On 28 September 2011 the ACCC accepted, under Division 6 of Part IIIA of the Competition and Consumer Act 2010 (CCA), the 2011 Undertaking provided to the ACCC by Viterra on 22 September 2011.
Prior to the commencement of the Structural Separation Undertaking (SSU), Telstra was subject to an operational separation framework which was intended to promote equivalence between Telstra wholesale and retail customers.
In July 2010, Telstra announced that it would be upgrading its existing copper network in South Brisbane to a fibre-to-the-premises network.
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
On 15 April 2009, GrainCorp lodged an Undertaking for assessment.
Viterra Operations Limited (Viterra) operates bulk wheat port terminals at Port Adelaide (Inner Harbour and Outer Harbour), Thevenard, Port Lincoln, Wallaroo and Port Giles and is a subsidiary of Glencore International Plc.