218 results, showing 21 to 30
The ACCC is reviewing the regulatory framework for ARTC's Interstate network.
On 3 September 2021, Port of Portland Pty Limited applied to the ACCC to be determined an exempt service provider of port terminal services at its port terminal facility at Portland, Victoria.
On 3 May 2022 the ACCC released a final determination document confirming that it has determined Port of Portland Pty Limited to be an exempt service provider of port terminal services at its Portland facility. The exemption was made by notifiable instrument.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ACCC has the ability to collect information from industry through the record keeping rule to undertake its telecommunications regulatory functions.
On 8 November 2021, TPG submitted a joint functional separation undertaking to the ACCC on behalf of itself and various subsidiaries in accordance with section 151C of the Telecommunications Act 1997.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
The ACCC is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
On 20 December 2021 the ACCC wrote to Port of Portland Limited (POPL) regarding its 2021-22 bulk grain export capacity allocation process and non-compliance with subclause 25(2) of the Port Terminal Access (Bulk Wheat) Code of Conduct.
On 23 April 2020, the ACCC engaged GHD to conduct a Depreciated Optimised Replacement Cost (DORC) valuation of ARTC's Interstate network to determine the Regulated Asset Base (RAB).