41 results, showing 21 to 30
The ACCC received a number of submissions from stakeholders and interested parties during the development of the Water Trading Rules advice.
The rules relate to water planning and management charges in the Murray-Darling Basin, and require information on these charges to be published.
The minister wrote to the ACCC in September 2009 requesting advice on possible amendments of a technical nature to the rules
In December 2007, the minister wrote to the ACCC requesting advice on the water market rules as required under ss.98(1) of the Water Act 2007 by December 2008.
Rules governing termination fees have been developed to ensure there is a balance between the interests of irrigators who are exiting an irrigation district and irrigators that wish to remain.
On 19 March 2009, the ACCC released final pricing principles and indicative prices for the mobile terminating access service (MTAS) for the period of 1 January 2009 to 31 December 2011.
The ACCC held a consultation process about model non-price terms and conditions for the public switched telephone network (PSTN), unconditioned local loop service (ULLS) and local carriage service (LCS).
The development process of the Airport quality of service monitoring guideline involved two rounds of consultation before a final guideline was released in October 2008.
The ACCC has taken the submissions into account in developing the final pricing principles and indicative prices. The final report was released on 6 August 2008.
The ACCC released the final version of the telecommunications transmission cost model in April 2008.