89 results, showing 51 to 60
On 18 November 2009, the ACCC released a final decision to vary the class exemptions for the WLR, LCS and PSTN OA services.
On 15 April 2009, GrainCorp lodged an Undertaking for assessment.
Viterra Operations Limited (Viterra) operates bulk wheat port terminals at Port Adelaide (Inner Harbour and Outer Harbour), Thevenard, Port Lincoln, Wallaroo and Port Giles and is a subsidiary of Glencore International Plc.
The exemptions provisions relating to the WLR, LCS and PSTN OA services have been removed from the relevant final access determinations as of 17 December 2011. The exemptions no longer apply in any Exchange Service Areas.
On 22 April 2009 the ACCC decided to reject the Undertaking. The ACCC released a final decision to reject this Telstra and ULLS Undertaking on 28 April 2009.
On 14 April 2009, CBH lodged an Undertaking for assessment
On 19 March 2009, the ACCC released final pricing principles and indicative prices for the mobile terminating access service (MTAS) for the period of 1 January 2009 to 31 December 2011.
The ACCC released its final decision on 25 November 2008 in regards to Telstra's application seeking exemption from the standard access obligations of the DTCS.
The ACCC held a consultation process about model non-price terms and conditions for the public switched telephone network (PSTN), unconditioned local loop service (ULLS) and local carriage service (LCS).
On 29 October 2008 the ACCC made two individual exemption orders exempting Telstra from the standard access obligations in respect of the supply of the Public Switched Telephone Network Originating Access (PSTN OA) service.