44 results, showing 31 to 40
On 3 October 2012, the ACCC made a final access determination for the Local Bitstream Access Service (LBAS). A copy of the LBAS final access determination is available on the public register of access determinations.
The ACCC published a final access determination for the domestic transmission capacity service (DTCS) in June 2012.
On 16 December 2011 the ACCC commenced an inquiry into declaration of wholesale ADSL services under section 152AL of the Competition and Consumer Act 2010 (the Act).
On 8 December 2011 the ACCC released a final access determination for the mobile terminating access service (MTAS) for the period 1 January 2012 to 30 June 2014.
On 20 July 2011 the ACCC made final access determinations for the declared fixed line services. The final access determinations are backdated to start on 1 January 2011 and expire on 30 June 2014.
In April 2011, following further consultation with industry participants, the ACCC decided not to commence a declaration inquiry.
On 30 September 2010 the ACCC issued a final report varying the domestic transmission capacity service (DTCS) declaration. In the final report the ACCC decided to vary the DTCS service description to include Ethernet network interfaces.
The ACCC's final view is that it is not satisfied that varying the ULLS service description at this time would promote the long-term interests of end users.
On 15 July 2009, the ACCC issued a final decision to extend the declaration of each of the six fixed-line services for a period of five years until 31 July 2014.
The ACCC concluded its public inquiry into the declaration of the mobile terminating access service (MTAS) by releasing its final report on 28 May 2009.