Search

Found 19 results (0.306 seconds)

Search results

  1. Attachment 4: CEG Network Externality Surcharge Report ( PDF 183.9 KB )

    26 February 2009 - Microsoft Word - Optimal Network Externality Markup Network Externality Surcharge A report for Optus Jason Ockerby … of the optimal network externality surcharge 11  3.1.  Subscription market 13  3.2.  Termination market 17  3.3.  Setting marginal social cost equal to marginal social benefit 21  3.4.  Value of the optimal network externality surcharge 24  Competition …
  2. GrainCorp - presentation to the ACCC - 22 May 2009 ( PDF 1.01 MB )

    28 May 2009 - GrainCorp will apply storage surcharge to move grain Late Vessel Failed Survey Storage fee surcharge 8 Within 5 days of ETA Load …
  3. Optus public submissions ( PDF 714.62 KB )

  4. MTAS pricing principles determination 2009-11 ( PDF 273.57 KB )

    19 March 2009 - and also proposes that a network externality surcharge be incorporated into the setting of indicative MTAS prices. The ACCC … Surcharge There has been considerable debate regarding the possibility of a network externality surcharge (NES) being included … Limited, p291. 28 ibid, paras 281 – 289. 29 CEG 2008, CEG Network Externality Surcharge, Attachment to Optus Submission …
  5. Draft rules - water infrastructure charge rules ( PDF 129.36 KB )

    6 April 2009 - to provide, to customers. surcharge includes penalty. the Act means the Water Act 2007. transitional period means the period … services from the infrastructure operator; and (b) details of discounts and surcharges applicable to those access services …
  6. Volume 3 - Fn 3 - Application by Optus Mobile Pty Limited & Optus Networks Pty Limted ( PDF 264.68 KB )

    16 October 2009 - of its fixed and common costs and a mark−up to include a network externality surcharge. That has therefore led to an inquiry … Externality Surcharge ("NES"). This costs model is referred to as FL−LRIC++.Optus’ price options were calculated by reference … Externality Surcharge ("NES"). This costs model is referred to as FL−LRIC++. 33. The prices in Optus’ undertaking were based …
  7. Supporting submission - GrainCorp - 16 April 2009 ( PDF 822.34 KB )

    20 April 2009 - GrainCorp submission to the ACCC in support of the access undertaking dated 15 April 2009 GrainCorp Operations Limited FINAL: 16 April 2009                GrainCorp Operations Limited    Submission to the Australian Competition & Consumer  Commission    Port terminal services access undertaking    Dated  16 April 2009      FOR PUBLIC REGISTER  ii 1  Introduction and purpose of submission 1  1.1  I …
  8. Draft advice - water infrastructure charge rules ( PDF 742.79 KB )

    6 April 2009 - ACCC report Water infrastructure charge rules Draft advice April 2009 © Commonwealth of Australia 2009 This work is copyright. Apart from any use permitted by the Copyright Act 1968, no part may be reproduced without permission of the Australian Competition and Consumer Commission. Requests and inquiries concerning reproduction and rights should be addressed to the Director Publishing, Australian …
  9. Volume 3 - Fn 209 - Telstra-Chime ULL dispute (Mar-08) Reasons ( PDF 2.51 MB )

    16 October 2009 - ACCC report Unconditioned Local Loop Service Access Dispute Between Telstra Corporation Limited (access provider) and Chime Communications Pty Ltd (access seeker) Statement of Reasons for Final Determination March 2008 © Commonwealth of Australia 2008 This work is copyright. Apart from any use permitted by the Copyright Act 1968, no part may be reproduced without permission of the Australian Compe …
  10. Nigel Attenborough Expert Report 6 November 2009 ( PDF 393.95 KB )

    10 November 2009 - estimates of price elasticities) to estimate the value of a network externality surcharge on interconnection charges in African …