294 results, showing 191 to 200
In July 2010, Telstra announced that it would be upgrading its existing copper network in South Brisbane to a fibre-to-the-premises network.
On 8 December 2011 the ACCC released a final access determination for the mobile terminating access service (MTAS) for the period 1 January 2012 to 30 June 2014.
On 16 December 2011 the ACCC released a final decision to vary the final access determinations to remove the exemption provisions for the WLR, LCS and PSTN OA declared fixed line services.
On 23 December 2010, Australian Bulk Alliance Pty Ltd (ABA) (now Emerald) lodged a proposed access undertaking for its port terminal services with the ACCC for assessment. After a public consultation process, a revised undertaking was lodged on 21 September 2011. This revised undertaking was accepted by the ACCC on 28 September 2011.
The ACCC released its decision to not object to this price notification on 22 September 2011.
The Water Charge (Infrastructure) Rules 2010 commenced on 12 January 2011 after being made by the Minister for Sustainability, Environment, Water, Population and Communities.
On 20 July 2011 the ACCC made final access determinations for the declared fixed line services. The final access determinations are backdated to start on 1 January 2011 and expire on 30 June 2014.
ARTC lodged an access undertaking application for the Hunter Valley Rail Network with the ACCC.
In September 2010, ARTC submitted a proposed access undertaking to the ACCC for assessment.
On 25 January 2011, Australia Post provided the ACCC with a draft price notification proposing to increase the prices of a number of its reserved services, to become effective on 4 July 2011. The ACCC has decided to not object to the price increases in Australia Post’s price notification.