310 results, showing 161 to 170
On 7 November 2014, the ACCC commenced a public inquiry into varying the 2012 domestic transmission capacity service (DTCS) final access determination.
ACCC reports to the next generation networks discussions.
In January 2014, ARTC submitted a proposed variation to the accepted Hunter Valley access undertaking to the ACCC for assessment.
The ACCC has granted an exemption for GrainCorp’s Carrington terminal at the Port of Newcastle under the new mandatory code on bulk wheat terminal access.
On 28 September 2011 the ACCC accepted the 2011 Undertaking provided to the ACCC by CBH on 20 September 2011.
GrainCorp provided the ACCC with a revised Proposed 2011 Undertaking on 31 January 2011 which contains technical amendments to the Undertaking lodged on 22 September 2010.
Co-operative Bulk Handling (CBH) is a bulk handling company that operates four bulk wheat port facilities in Western Australia.
Information about the Access undertaking for Emerald Logistics Services Pty Ltd (Emerald).
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
On 10 June 2014 Airservices submitted a formal price notification to the ACCC proposing new charges for en route, terminal navigation and aviation rescue and fire-fighting services, effective from 1 July 2014.