306 results, showing 161 to 170
On 28 September 2011 the ACCC accepted the 2011 Undertaking provided to the ACCC by CBH on 20 September 2011.
GrainCorp provided the ACCC with a revised Proposed 2011 Undertaking on 31 January 2011 which contains technical amendments to the Undertaking lodged on 22 September 2010.
Co-operative Bulk Handling (CBH) is a bulk handling company that operates four bulk wheat port facilities in Western Australia.
Information about the Access undertaking for Emerald Logistics Services Pty Ltd (Emerald).
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
On 10 June 2014 Airservices submitted a formal price notification to the ACCC proposing new charges for en route, terminal navigation and aviation rescue and fire-fighting services, effective from 1 July 2014.
On 28 June 2013 ARTC submitted a request to vary its 2011 undertaking to the ACCC.
On 17 April 2014, the ACCC commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.
The ACCC commenced an inquiry into whether to extend, vary or revoke the domestic mobile terminating access service declaration, or whether to make a new declaration.
Telstra’s migration plan requires it to develop six 'required measures' that relate to the operating processes Telstra will follow when disconnecting customers from its copper and HFC networks.
This project page contains information and correspondence about Telstra’s Roadmap and Work Plan for the development of the required measures.