Proposed variations to the s87B undertakings of Alinta Limited and others and Epic Energy (WA) Transmission Pty Ltd
Type of assessment
Variation to Undertakings
Reference
39399
Acquirer(s)
Alinta Network Services Pty Ltd DBNGP Holdings Pty Ltd Epic Energy (WA) Transmission Pty Ltd Diversified Utility and Energy Trust Alinta Ltd Alcoa of Australia Ltd
Target(s)
Epic Energy Pty Ltd
Industry
Gas
Summary
Parties to the s87B undertakings of Alinta Limited and others and Epic Energy (WA) Transmission Pty Ltd have submitted proposed variations to the undertakings.
The proposed variations included several amendments to the undertakings in light of changes in circumstances that had occurred since the undertakings were accepted.
Outcome of assessment
Not opposed
Total review days *
37
Commenced public review
3rd December 2009
Date completed
28th January 2010
Competition analysis
In summary, the proposed variations:
- permitted the operator of the Dampier to Bunbury Natural Gas Pipeline (DBNGP) to reach agreements with individual shippers in order to pass on a proportion of the increased price Epic Energy (WA) Transmission Pty Ltd will pay for system use gas under its agreement with Alinta Sales Pty Ltd. There are two types of agreements that the DBNGP operator may reach with shippers:
- to charge a shipper a system use gas tariff, or
- to reduce the charges payable by a shipper under the standard shipper contract in consideration for that shipper supplying its own share of system use gas to the DBNGP.
The variations permitted both types of agreement provided that the tariff imposed or reduction of charges was not less favourable than that agreed with Alinta Sales Pty Ltd, Alinta Energy (LPG) Pty Ltd, or a shipper that is an associate of Prime Infrastructure Holdings Limited.
The ACCC considered that the proposed variations would adequately address the competition concerns that the undertakings intended to address. On this basis, and in light of changes in circumstances that had occurred since the undertakings were accepted, the ACCC decided to consent to the proposed variations.
The ACCC also consented to other variations to the undertakings which have the effect of:
- removing Alinta Network Services Pty Ltd as a party to the undertakings given that it no longer has a role in the operation of the DBNGP;
- ensuring that references to corporate entities within the undertakings reflect name changes that have occurred since 2004;
- deleting obligations which have been discharged by the parties (for example, in relation to capacity expansion and settlement of the Epic proceedings); and
- deleting ring fencing and non-discrimination clauses which are covered by the 2007 undertaking of Babcock and Brown Infrastructure and Babcock and Brown Power.
Other
Annexure D to Market Inquiries Letter - EEWAT Variation 3rd December 2009 D09+191703.pdf (199.9 KB)
Annexure E to Market Inquiries Letter - BBI/BBP Undertaking 3rd December 2009 D09+191694.pdf (820.0 KB)
Annexure C to Market Inquiries Letter - Proposed Variation to the Consortium Undertaking 3rd December 2009 D09+191699.pdf (1,003.7 KB)
Review timeline
Date
Event
3rd December 2009
ACCC commenced review under the Merger Review Process Guidelines.
18th December 2009
Closing date for submissions from interested parties.
28th January 2010
ACCC announced that it consents to the proposed variations.
* Total Review days = Total business days less public holidays and time during which the review was suspended.