42 results, showing 1 to 10
On 2 September 2020, Uniti Group Limited (Uniti) submitted a joint functional separation undertaking and a supporting submission in accordance with section 151C of the Telecommunications Act. The ACCC accepted the undertaking on 21 October 2020.
The Australian Rail Track Corporation has provided its indicative Constrained Coal Customer Unders and Overs Estimate and True-Up Test Audit report for 2021, ahead of its formal annual compliance submission (expected in late 2022).
On 29 November 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC.
ARTC submitted its annual compliance documentation for calendar years 2019 and 2020 to the ACCC for assessment on 26 November 2021.
On 29 March 2022, NBN Co lodged a variation to its Special Access Undertaking (SAU) with the ACCC. NBN Co's proposed SAU variation followed an extensive industry consultation process hosted by the ACCC during the second half of 2021 to consider the future regulatory framework for the NBN.
On 8 November 2021, TPG submitted a joint functional separation undertaking to the ACCC on behalf of itself and various subsidiaries in accordance with section 151C of the Telecommunications Act 1997.
On 20 December 2021 the ACCC wrote to Port of Portland Limited (POPL) regarding its 2021-22 bulk grain export capacity allocation process and non-compliance with subclause 25(2) of the Port Terminal Access (Bulk Wheat) Code of Conduct.
On 18 June 2021, the ACCC hosted an industry roundtable to commence a process to consider the regulatory framework for the NBN.
On 10 August 2021, the ACCC released a final determination for the period 1 January to 31 December 2018. The ACCC's final determination is that ARTC's revised submission from 17 June 2021 is in accordance with all requirements under the HVAU. The submitted true-up test audit is also in accordance with HVAU requirements.
Under section 2.2(b) of the 2008 Interstate Access Undertaking (IAU), ARTC must submit to the ACCC a written statement outlining whether or not it intends to submit a new undertaking to the ACCC for its consideration, no later than six months prior to the expiry of the 2008 IAU.