26 results, showing 1 to 10
Under NBN Co’s Special Access Undertaking, NBN Co must lodge its proposed set of Accounting Procedures with the ACCC by 31 March 2024 (or the next business day). NBN Co provided its submission on 2 April 2024.
The Migration Plan sets out the steps that Telstra will take to progressively migrate voice and broadband services from its copper and Hybrid Fibre Coaxial networks to the NBN.
On 2 September 2016 the ACCC released a report finalising its assessment of the NBN Co-Telstra service delivery agreements.
The ACCC has completed its second annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin. This review applies to charges for 2016-17, the third and last year of the regulatory period 2014–17.
On 25 June 2015, the Independent Pricing and Regulatory Tribunal of NSW (IPART) submitted an application for accreditation to the ACCC .
The ACCC conducted its first annual review of Water NSW’s regulated charges for water infrastructure services in the Murray-Darling Basin for 2015-16.
For the 1 July 2014 to 30 June 2017 regulatory period, the ACCC was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
Telstra’s migration plan requires it to develop six 'required measures' that relate to the operating processes Telstra will follow when disconnecting customers from its copper and HFC networks.
This project page contains information and correspondence about Telstra’s Roadmap and Work Plan for the development of the required measures.
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.
This project page contains Telstra’s submission of required measures 2, 3, 4 and 6.